Test
NC1923952 OXYPROBE DESICCANT 100G
FT-IR spectrometers require dessicant kits to keep their optical paths moisture-free. PerkinElmer recommends that your instrument's desiccant be replaced every six months. Your spectrometer's manual has instructions on how to install the dessicant. Depending on the spectrometer, you will need two to three dessicant kits every six months.
Dessicant filter cartridge good for 20 clean tests
NC2160131 DESICCANT 250G
NC2118508 DESICCANT FOR SD900
NC2003850 DESICCANT CHAMBER FILTER
NC2136711 DESICCANT DRYER
NC2169287 CARTRIDGE DESICCANT 1000 GRA
Desiccant Replacement Kit
NC2388888 DESICCANTS- UNIT SIZE2- 5GAL
Convenient, easy to handle packs filled with moisture absorbing silica gel beads are available in multiple sizes to fit most desiccators. Durable microfiber bag securely contains beads eliminating the risk of leakage and is unaffected by moisture. Indicator dot changes from blue when dry to pink when moist to easily identify when recharging is needed. Saturated gel can be regenerated by microwaving bag for 6 minutes or Regenerate at 150C (blue color changes to pink_ May be regenerated repeatedly without degradation. Supplied individually sealed in moisture-proof pouch.
DESICCANT TUBE 40/35
NC2185345 LARGE DESICCANT TITANIUM
NC2101305 DESICCANT CARTRIDGE ASSEMBLY